| Product Name | Middle Exhaust Manifold Pipe |
|---|---|
| OEM Part Number | 202V08102-0306 |
| Application / Fit For | HOWO-T7H,SITRAK-C7H |
| Applicable Assembly Model | Engine MC13-MC13.48-480HP/MC13-MC13.54-540HP |
| Installation Position | Engine-Intake/Exhaust |
| Material | 20# seamless steel pipe / galvanized steel |
| Net Weight | Available upon request |
| Dimension (L×W×H) | Available upon request |
| Surface Treatment | Anti-rust paint or galvanized |
| Certificate | ISO 9001:2026 |
| Inspection Support | SGS, BV, Cotecna |
| Packing | Neutral packing or as customer’s requirement |
| MOQ | 1 pc |
| Lead Time | 7–25 working days |
| In-stock | within 7 working days; bulk/out-of-stock: 15–25 working days |
| Payment Terms | TT, L/C, Western Union |
202V08102-0306 Middle Exhaust Manifold Pipe is a Sinotruk engine part built for HOWO T7H and SITRAK C7H trucks, fitted on the MC13 engine assembly (480 / 540 HP ratings) in the engine intake/exhaust area.
It is produced in 20# seamless steel pipe / galvanized steel with anti-rust paint or galvanized surface treatment to the original drawing, so there is no drilling, bending or adapter plate on installation.
That duty means it must resist heat, oil spray and constant vibration, which is why this grade of material and finish is used.
Q1. What is your terms of packing?
A: Normally, we pack goods with wooden cases. If you have special requirements, please let us know in advance. If you have a legally registered patent, we can pack goods in your branded boxes after receiving your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of 202V08102-0306 and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, 202V08102-0306 will take 7 to 25 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% inspection before delivery.
Q7. How do you make our business long-term and good relationship?
A: 1) We keep 202V08102-0306 quality and competitive price to ensure our customers benefit.
2) We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Competitive price. Email inquiry with part number, part name and parts quantity. We will quote within 24 working hours.
6 months after B/L date. Exclusive and unique solutions can be provided to our customers by our well-trained professional engineers and staffs.
We have long-term cooperative forwarders, getting special discounts from DHL for air orders and from many shipping lines for sea orders. Customer forwarder also accepted.
Timely delivery: 7 days for air order, 20-30 days for sea order based on containers.
Standard documents (BL, CO, PL, IN) and certificates (SASO, CIQ, COO, Form A, Form E, Form F, COC) for customs clearance.
100% inspection before delivery. Neutral packing or as customer's requirement. Wooden cases, cartons or pallets for safe shipment.
Normally, we pack our goods with wooden cases. If you have special requirements, please mention that in advance.
Three main packing methods:
1. Domestic packing for Chinese market.
2. Standard export package (from inside to outside): oiled paper, boxes, cartons, and wooden pallets.
3. Customized package.
We are a first-class heavy duty vehicles and spare parts supplier in China. 20-year experience and cooperation with over 300 companies make us professional in international trade.
The normal package is waterproof membrane, plywood box or carton. If the container is too tight, we will use PE film for packing or pack it according to customers' special request.
International Express: below 150kg, fast and convenient such as UPS, DHL, TNT, EMS etc. Air transportation: 3-7 days. Sea transportation: 20-30 days worldwide.
If you have any questions or need any assistance, please feel free to contact us. We will reply within 24 hours.
Request A Quote on WhatsApp
Ask for photos of the part with visible SINOTRUK serial numbers.
Demand a stamped invoice with part numbers and descriptions.
Avoid dealers who can't match parts to your truck's VIN or engine model.
Request a pre-shipment inspection report or packaging image.
Choose partners offering pre-shipment inspection and tracking.
All five checks can be completed before you pay a deposit.
Sinotruk Exhaust Backpressure: Muffler and Pipe Restriction
A crushed pipe or a collapsed muffler baffle raises exhaust backpressure, costs power and looks like a turbo fault. Measure it with a gauge at the manifold.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Exhaust Manifold Leak: Soot Tracks, Warping and Bolt Torque
A leaking exhaust manifold shows as a black soot track and a whistle under load. Losing exhaust gas before the turbo costs boost, so fix it before the flange warps.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
HOWO T7H Exhaust Brake Not Working: Butterfly and Wiring Checks
An exhaust brake that does nothing is usually a stuck butterfly or a dead solenoid. Test the actuator stroke in ten minutes with the engine off.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Engine Oil: CK-4 Selection and Drain Intervals
Oil choice on an MC11 or MC07 is a specification question, not a brand question. Learn what CK-4 changes and how duty cycle resets the interval.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H