| Product Name | Engine Intercooler Intake Pipe |
|---|---|
| OEM Part Number | 201V09411-5175 |
| Application / Fit For | HOWO-T7H,SITRAK-C7H |
| Applicable Assembly Model | Engine MC11-MC11.32-320HP/MC11-MC11.36-360HP/MC11-MC11.40-400HP/MC11-MC11.44-440HP |
| Installation Position | Engine-Intercooler |
| Material | 20# seamless steel pipe / galvanized steel |
| Net Weight | Available upon request |
| Dimension (L×W×H) | Available upon request |
| Surface Treatment | Anti-rust paint or galvanized |
| Certificate | ISO 9001:2026 |
| Inspection Support | SGS, BV, Cotecna |
| Packing | Neutral packing or as customer’s requirement |
| MOQ | 1 pc |
| Lead Time | 7–25 working days |
| In-stock | within 7 working days; bulk/out-of-stock: 15–25 working days |
| Payment Terms | TT, L/C, Western Union |
201V09411-5175 Engine Intercooler Intake Pipe is a Sinotruk engine part built for HOWO T7H and SITRAK C7H trucks, fitted on the MC11 engine assembly (320 / 360 / 400 / 440 HP ratings) in the engine intercooler area.
It is produced in 20# seamless steel pipe / galvanized steel with anti-rust paint or galvanized surface treatment to the original drawing, so there is no drilling, bending or adapter plate on installation.
That duty means it must resist heat, oil spray and constant vibration, which is why this grade of material and finish is used.
Q1. What is your terms of packing?
A: Normally, we pack goods with wooden cases. If you have special requirements, please let us know in advance. If you have a legally registered patent, we can pack goods in your branded boxes after receiving your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of 201V09411-5175 and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, 201V09411-5175 will take 7 to 25 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% inspection before delivery.
Q7. How do you make our business long-term and good relationship?
A: 1) We keep 201V09411-5175 quality and competitive price to ensure our customers benefit.
2) We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Competitive price. Email inquiry with part number, part name and parts quantity. We will quote within 24 working hours.
6 months after B/L date. Exclusive and unique solutions can be provided to our customers by our well-trained professional engineers and staffs.
We have long-term cooperative forwarders, getting special discounts from DHL for air orders and from many shipping lines for sea orders. Customer forwarder also accepted.
Timely delivery: 7 days for air order, 20-30 days for sea order based on containers.
Standard documents (BL, CO, PL, IN) and certificates (SASO, CIQ, COO, Form A, Form E, Form F, COC) for customs clearance.
100% inspection before delivery. Neutral packing or as customer's requirement. Wooden cases, cartons or pallets for safe shipment.
Normally, we pack our goods with wooden cases. If you have special requirements, please mention that in advance.
Three main packing methods:
1. Domestic packing for Chinese market.
2. Standard export package (from inside to outside): oiled paper, boxes, cartons, and wooden pallets.
3. Customized package.
We are a first-class heavy duty vehicles and spare parts supplier in China. 20-year experience and cooperation with over 300 companies make us professional in international trade.
The normal package is waterproof membrane, plywood box or carton. If the container is too tight, we will use PE film for packing or pack it according to customers' special request.
International Express: below 150kg, fast and convenient such as UPS, DHL, TNT, EMS etc. Air transportation: 3-7 days. Sea transportation: 20-30 days worldwide.
If you have any questions or need any assistance, please feel free to contact us. We will reply within 24 hours.
Request A Quote on WhatsApp
Ask for photos of the part with visible SINOTRUK serial numbers.
Demand a stamped invoice with part numbers and descriptions.
Avoid dealers who can't match parts to your truck's VIN or engine model.
Request a pre-shipment inspection report or packaging image.
Choose partners offering pre-shipment inspection and tracking.
All five checks can be completed before you pay a deposit.
Sinotruk Air Compressor Oil Carry-Over Into the Intake
A compressor that passes oil fouls the intake, the intercooler and the valves. The symptom is oily charge air that is not from the turbocharger.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Engine Oil: CK-4 Selection and Drain Intervals
Oil choice on an MC11 or MC07 is a specification question, not a brand question. Learn what CK-4 changes and how duty cycle resets the interval.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
HOWO T7H Low Power and Black Smoke: Intercooler Leak Test
A split charge-air cooler loses power before it loses coolant. Boost-pressure leak testing finds it in one hour and prevents a needless turbo swap.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Engine Mount Failure: Vibration, Fan Contact and Clutch Judder
A collapsed engine mount on a Sinotruk shows up as vibration at idle, a fan that touches the shroud, and clutch judder on take-off. Test before replacing.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H