| Product Name | Cng Throttle Control |
|---|---|
| OEM Part Number | VG1560110402 |
| Application / Fit For | HOWO-A7 |
| Applicable Assembly Model | Engine WD615-WD615.47-371HP/WD615-WD615.69-336HP/WD615-WD615.87-290HP/WD615-WD615.62-266HP/D10-D10.34-340HP/D10-D10.38-380HP |
| Installation Position | Engine |
| Material | Electronic components (ABS housing + PCB) |
| Net Weight | Available upon request |
| Dimension (L×W×H) | Available upon request |
| Surface Treatment | Painting / Galvanized / Shot Blasting |
| Certificate | ISO 9001:2026 |
| Inspection Support | SGS, BV, Cotecna |
| Packing | Neutral packing or as customer’s requirement |
| MOQ | 1 pc |
| Lead Time | 7–25 working days |
| In-stock | within 7 working days; bulk/out-of-stock: 15–25 working days |
| Payment Terms | TT, L/C, Western Union |
Cng Throttle Control, OEM part number VG1560110402, is a Sinotruk engine part for HOWO A7 trucks.
It works on the WD615 engine assembly (371 / 336 / 290 / 266 HP ratings) and mounts in the original mounting position.
Electronic components (ABS housing + PCB) material built to the original drawing: mounting points line up and fitting needs no rework, with anti-rust protection agreed at order stage.
That duty means it must resist heat, oil spray and constant vibration, which is why this grade of material and finish is used.
Q1. What is your terms of packing?
A: Normally, we pack goods with wooden cases. If you have special requirements, please let us know in advance. If you have a legally registered patent, we can pack goods in your branded boxes after receiving your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of VG1560110402 and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, VG1560110402 will take 7 to 25 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% inspection before delivery.
Q7. How do you make our business long-term and good relationship?
A: 1) We keep VG1560110402 quality and competitive price to ensure our customers benefit.
2) We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Competitive price. Email inquiry with part number, part name and parts quantity. We will quote within 24 working hours.
6 months after B/L date. Exclusive and unique solutions can be provided to our customers by our well-trained professional engineers and staffs.
We have long-term cooperative forwarders, getting special discounts from DHL for air orders and from many shipping lines for sea orders. Customer forwarder also accepted.
Timely delivery: 7 days for air order, 20-30 days for sea order based on containers.
Standard documents (BL, CO, PL, IN) and certificates (SASO, CIQ, COO, Form A, Form E, Form F, COC) for customs clearance.
100% inspection before delivery. Neutral packing or as customer's requirement. Wooden cases, cartons or pallets for safe shipment.
Normally, we pack our goods with wooden cases. If you have special requirements, please mention that in advance.
Three main packing methods:
1. Domestic packing for Chinese market.
2. Standard export package (from inside to outside): oiled paper, boxes, cartons, and wooden pallets.
3. Customized package.
We are a first-class heavy duty vehicles and spare parts supplier in China. 20-year experience and cooperation with over 300 companies make us professional in international trade.
The normal package is waterproof membrane, plywood box or carton. If the container is too tight, we will use PE film for packing or pack it according to customers' special request.
International Express: below 150kg, fast and convenient such as UPS, DHL, TNT, EMS etc. Air transportation: 3-7 days. Sea transportation: 20-30 days worldwide.
If you have any questions or need any assistance, please feel free to contact us. We will reply within 24 hours.
Request A Quote on WhatsApp
Ask for photos of the part with visible SINOTRUK serial numbers.
Demand a stamped invoice with part numbers and descriptions.
Avoid dealers who can't match parts to your truck's VIN or engine model.
Request a pre-shipment inspection report or packaging image.
Choose partners offering pre-shipment inspection and tracking.
All five checks can be completed before you pay a deposit.
Sinotruk Turbo Surge and Wastegate: Boost Control Faults
Surge is a fluttering boost noise under load, and it is a control fault, not a turbo failure. Check the wastegate or VGT command before replacing the unit.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk MPROP Metering Unit Faults: Rail Pressure Control
The metering unit on the high pressure pump decides how much fuel enters. A sticking one produces rail pressure codes, rough idle and a start that needs long cranking.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Trailer Control Hand Valve: Checks and Adjustments
The trailer hand control valve is the one valve a tractor driver uses every day on a slope start. When it leaks or sticks, the trailer brake behaves unpredictably.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Engine Oil: CK-4 Selection and Drain Intervals
Oil choice on an MC11 or MC07 is a specification question, not a brand question. Learn what CK-4 changes and how duty cycle resets the interval.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H