| Product Name | A/C Control Unit |
|---|---|
| OEM Part Number | 712W61942-1315 |
| Application / Fit For | HOWO-T7H,SITRAK-C7H |
| Applicable Assembly Model | Cab HOWO-T7H |
| Installation Position | Cab |
| Material | Electronic components (ABS housing + PCB) |
| Net Weight | Available upon request |
| Dimension (L×W×H) | Available upon request |
| Surface Treatment | Painting / Galvanized / Shot Blasting |
| Certificate | ISO 9001:2026 |
| Inspection Support | SGS, BV, Cotecna |
| Packing | Neutral packing or as customer’s requirement |
| MOQ | 1 pc |
| Lead Time | 7–25 working days |
| In-stock | within 7 working days; bulk/out-of-stock: 15–25 working days |
| Payment Terms | TT, L/C, Western Union |
The 712W61942-1315 A/C Control Unit is a Sinotruk cab part that serves HOWO T7H and SITRAK C7H trucks on the cab assembly and sits in the original mounting position.
It is made of electronic components (ABS housing + PCB) and follows the original dimensions and mounting points, so it replaces the old unit without modification.
Surface treatment such as anti-rust paint or zinc plating is confirmed with your order.
That duty means it must resist vibration, dust and weather exposure, which is why this grade of material and finish is used.
Q1. What is your terms of packing?
A: Normally, we pack goods with wooden cases. If you have special requirements, please let us know in advance. If you have a legally registered patent, we can pack goods in your branded boxes after receiving your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of 712W61942-1315 and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, 712W61942-1315 will take 7 to 25 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% inspection before delivery.
Q7. How do you make our business long-term and good relationship?
A: 1) We keep 712W61942-1315 quality and competitive price to ensure our customers benefit.
2) We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Competitive price. Email inquiry with part number, part name and parts quantity. We will quote within 24 working hours.
6 months after B/L date. Exclusive and unique solutions can be provided to our customers by our well-trained professional engineers and staffs.
We have long-term cooperative forwarders, getting special discounts from DHL for air orders and from many shipping lines for sea orders. Customer forwarder also accepted.
Timely delivery: 7 days for air order, 20-30 days for sea order based on containers.
Standard documents (BL, CO, PL, IN) and certificates (SASO, CIQ, COO, Form A, Form E, Form F, COC) for customs clearance.
100% inspection before delivery. Neutral packing or as customer's requirement. Wooden cases, cartons or pallets for safe shipment.
Normally, we pack our goods with wooden cases. If you have special requirements, please mention that in advance.
Three main packing methods:
1. Domestic packing for Chinese market.
2. Standard export package (from inside to outside): oiled paper, boxes, cartons, and wooden pallets.
3. Customized package.
We are a first-class heavy duty vehicles and spare parts supplier in China. 20-year experience and cooperation with over 300 companies make us professional in international trade.
The normal package is waterproof membrane, plywood box or carton. If the container is too tight, we will use PE film for packing or pack it according to customers' special request.
International Express: below 150kg, fast and convenient such as UPS, DHL, TNT, EMS etc. Air transportation: 3-7 days. Sea transportation: 20-30 days worldwide.
If you have any questions or need any assistance, please feel free to contact us. We will reply within 24 hours.
Request A Quote on WhatsApp
Ask for photos of the part with visible SINOTRUK serial numbers.
Demand a stamped invoice with part numbers and descriptions.
Avoid dealers who can't match parts to your truck's VIN or engine model.
Request a pre-shipment inspection report or packaging image.
Choose partners offering pre-shipment inspection and tracking.
All five checks can be completed before you pay a deposit.
Sinotruk MPROP Metering Unit Faults: Rail Pressure Control
The metering unit on the high pressure pump decides how much fuel enters. A sticking one produces rail pressure codes, rough idle and a start that needs long cranking.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Turbo Surge and Wastegate: Boost Control Faults
Surge is a fluttering boost noise under load, and it is a control fault, not a turbo failure. Check the wastegate or VGT command before replacing the unit.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
HOWO T7H Air Conditioning Not Cold: Charge, Compressor and Control
Warm air from a working blower is a refrigeration fault. Read both pressures before adding refrigerant, and check the condenser air path first.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H
Sinotruk Trailer Control Hand Valve: Checks and Adjustments
The trailer hand control valve is the one valve a tractor driver uses every day on a slope start. When it leaks or sticks, the trailer brake behaves unpredictably.
Repair FAQ · HOWO T7H / T5G · SITRAK C7H / C9H